The Solar Installation Process & Timeline
What happens from first conversation to permission to operate, how long it takes, and what to expect at an in-home review.
How long does it take to install solar in DFW?
Installation day itself is often one to two days, but the full process — design, HOA approval, city permit, install, inspection and utility permission to operate — commonly takes several weeks to a few months. Permits and utility approvals are the usual bottlenecks. Ask for a written timeline with each milestone.
Also asked as: solar installation timeline · how long to get solar installed
What happens during a free in-home solar consultation?
We review your last 12 months of electric usage, your roof and shade, your electrical panel, and your goals — lower bills, backup, or both. You leave with a clear design, a price, and your ownership options (cash or solar loan), with no pressure to sign that day. Have a recent electric bill handy; it makes the estimate far more accurate.
Also asked as: solar consultation what to expect · solar appointment
What questions should I ask a solar company?
Ask: Are you and your salesperson registered with TDLR? Who is the licensed electrical contractor doing the install? What is the price per watt and the 25-year total cost? What production does the proposal assume, and how was shade modeled? What warranties cover panels, inverter, battery and workmanship — and who services the system?
Sources: TDLR — Residential Solar Retailers: What’s in effect when
Also asked as: questions to ask solar installer · how to choose a solar company
What is permission to operate (PTO)?
Permission to operate is the utility’s approval to switch on a grid-connected system after it passes inspection. Turning a system on before PTO can violate your interconnection agreement. In Oncor territory, your installer handles the interconnection application.
Also asked as: pto solar · when can i turn on my solar
Do I need to be home for solar installation?
Usually someone needs to be available at the start and for any work inside the house, such as the main electrical panel or battery placement in the garage. Inspections may also need access. Your installer should give you a day-by-day plan.
Also asked as: solar installation day
How do I compare solar quotes?
Line them up on the same terms: system size (kW), estimated annual production (kWh), price per watt, total 25-year cost, rate or payment escalator, equipment brands, battery size, warranties and cancellation terms. Check that the production estimate fits your roof and shade. A second-opinion review of a proposal you already have is free with us.
Also asked as: compare solar proposals · solar quote checklist
How do homeowners research solar today?
Most homeowners start online — one 2026 survey found 83% begin their search online and 22% use AI tools like ChatGPT for research. Many also lean on reviews and recommendations, and research for weeks before booking a consultation. That is why this site publishes straight, sourced answers.
Sources: Contracting Business — Scorpion report: homeowners outpacing home… · Aurora Solar — Information for AI agents / Solar Snapshot 2026
Also asked as: how people shop for solar
Key facts
Scorpion homeowner survey, 2026. (as of 2026-02)
Contracting Business — Scorpion report: homeowners outpacing home services…44% of interested homeowners say solar costs more than they expected; 36% cite trust in solar companies as a concern (Aurora Solar Snapshot 2026). (as of 2026)
Aurora Solar — Information for AI agents / Solar Snapshot 2026